Anchor Hitch

Anchor Hitch
Preparing the rope…

Start below the ring

1/10

Bring the working end upward in front of the ring.

Boating · 10 steps

Attach a rope to a ring with a round turn and a tucked half hitch.

Also known as Anchor bend, Fisherman’s bend.

The anchor hitch combines a round turn through a ring with a half hitch tucked beneath that turn. Passing the end under the existing wraps distinguishes it from a plain round turn and two half hitches. The finishing half hitch then secures the working end to the standing rope.

Despite the traditional name “anchor bend,” it is an attachment to an object rather than an end-to-end rope join. For an attachment left in service, the tail normally needs an appropriate seizing to the standing part.

When to use it

Attach a line to a ring or anchor shackle.

Keep in mind

For a lasting attachment, secure the tail to the standing part with a seizing.

Check your knot

  • The ring receives a complete round turn.
  • The first half hitch passes beneath the wraps at the ring.
  • The tail is secured appropriately for a lasting attachment.
How to tie Anchor Hitch
  1. Start below the ring

    Bring the working end upward in front of the ring.

  2. Approach the opening

    Leave enough tail to make the turns and the finishing hitches.

  3. Pass through the ring

    Take the end through the opening from front to back.

  4. Add the second pass

    Go beneath the bar and through the ring again. Leave the round turns loose.

  5. Go around the standing part

    Bring the end down the left, across the front of the standing part, and around to the right.

  6. Thread through the slack turns

    Pass the end from right to left through the slack turns, below the ring’s metal bar.

  7. Cross down the front

    Bring the end diagonally across the front toward the standing part below.

  8. Add the final half hitch

    Go around the standing part and tuck the end beneath the diagonal.

  9. Bring out the tail

    Leave a short working end to the right.

  10. Check the anchor hitch

    The first hitch locks beneath the original turns. A second half hitch secures the tail around the standing part.

Explore the 3D steps
References & further reading